Oct
18
Sleep in Heavenly Peace (SHP)
Sat, Oct 18th
Description
FIRST SHIFT - SETUP (from 7-8:30am) we'll set up the Bed Build line tools and equipment, including tables, power tools,, jigs, hand tools, generators, extension cords and everything else needed to build the bunk beds. SECOND SHIFT - BUILD.
Solve 1 + 8 = ?